Browse all practice questions for the Back‑to‑Basics (BtB) Contracting Certification Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Back‑to‑Basics (BtB) Contracting Certification Practice Exam course image
All questions

These questions are part of the practice quiz. Start practicing

  • What is the main focus of Section F in a UCF?
  • Which type of contract is characterized by less risk for the contractor concerning cost performance?
  • What is an essential aspect of cost realism analysis in contracting?
  • Which person or role is often considered part of the technical personnel in the Acquisition Team?
  • Contract types differ based on which of the following factors?
  • True or False: Each government contract should be priced separately and independently.
  • Which term pertains to the reasonable expectation of a contract's total price against line item discrepancies?
  • Which two factors must be evaluated in every source selection process?
  • Generally, unless an exception applies, what must Contracting Officers promote when awarding Government contracts?
  • What are the statutory authorities that permit contracting without full and open competition?
  • What type of offeror may initiate a protest?
  • What is the process called when the Government exercises its right to terminate a contract due to the contractor's failure to perform?
  • What must be present in a contract for it to be deemed legally binding?
  • What is the preference for commerciality based on?
  • Which contract type is appropriate when the costs cannot be accurately estimated?
  • What type of OCI may arise if a support contractor assesses or evaluates its own work?
  • Which FAR part addresses organizational conflict of interest?
  • During the post-award phase, who holds the responsibility for quality?
  • Who is primarily responsible for initiating a contractor claim?
  • Which section details representations and certifications?
  • If a Contracting Officer receives an agency protest 8 days after contract award, what must the Contracting Officer do?
  • Which part of the Uniform Contract Format contains contract clauses?
  • Which section of the UCF contains information about a company's size status?
  • Do pre-negotiation objectives assist the contracting officer in determining a fair and reasonable price?
  • Who is designated and authorized by the contracting officer to perform specific functions?
  • What is received from a promisee in exchange for an offer by the promisor?
  • What are the two primary outcomes of Market Research in the context of meeting Government needs?
  • How many protest venues are available for offerors?
  • Who is responsible for making the final best value decision in the source selection process?
  • A show cause notice is utilized in situations where?
  • Which FAR part covers personal conflict of interest?
  • Which authority is most critical for government contractual obligations?
  • What is the focus of Section H in a UCF?
  • True or False: IAW FAR part 15, contracting officers can negotiate after evaluating offers and advise on deficiencies.
  • Contracting Officers shall promote what in soliciting offers and awarding Government contracts?
  • What is the potential consequence when a contractor holds an unfair competitive advantage?
  • What are the three basic approaches available to contractors for addressing OCI issues?
  • How many statutory authorities allow contracting without full and open competition?
  • What does it mean when a contracting professional determines a price is reasonable?
  • Why is Market Research conducted by agencies?
  • What term is used to describe a cost that can be assignable or chargeable to one or more cost objectives?
  • Bilateral modifications are used to make what type of adjustments?
  • What are possible indications of unbalanced pricing in a contract?
  • Which of the following is an example of an excusable delay?
  • Which element typically requires a contractor to deliver an item by a specific date?
  • Which document is essential in describing the parameters of a solicitation before a contract is awarded?
  • In a Uniform Contract Format, which part includes the schedule?
  • Which FAR Part regulates Market Research?
  • What does the term "competitive range" refer to in contracting?
  • Which of the following are considered Source Selection processes and techniques?
  • Under sealed bid procedures, solicitations are referred to as what?
  • What does Market Research help agencies become aware of?
  • What describes the legal competence of a person to enter a valid contract?
  • Communications conducted during the proposal evaluation aim to enhance understanding of the proposals and facilitate what process?
  • What is considered the vision of the Federal Acquisition System?
  • What does 'other than certified cost or pricing data' refer to?
  • What kind of analysis seeks to determine if estimated costs reflect an understanding of the contract requirements?
  • How does the concept of competition influence pricing agreements in contracting?
  • Which type of authority is legally binding in government contracting?
  • What role does the contracting officer play in the acquisition process?
  • What are the main objectives of Peer Reviews in the context of DoD contracting?
  • The vision of the Federal Acquisition System emphasizes what key aspect?
  • What is a possible risk for a contractor involved in biased ground rules?
  • In a solicitation, which term applies before award?
  • What process allows for early identification and resolution of concerns regarding acquisition strategy?
  • Which authority encompasses actions that are usual, customary, and necessary?
  • Where should supplies be examined for quantity and damage upon acceptance?
  • Which warranty consideration involves the length of time the warranty is valid?
  • What is the key characteristic of a solicitation provision?
  • What could signify a contractor taking on risk when dealing with unbalanced pricing?
  • What type of contract is designed to allow for economic price adjustments?
  • What happens if the contractor does not submit a claim within the specified time period?
  • What kind of notices can be used to inform potential contractors of upcoming requirements prior to bidding?
  • When requesting data other than certified cost or pricing data, what format should be used for submission?
  • Which contract method employs competitive bids and public openings of bids?
  • What is the primary goal of claims submissions in the contracting context?
  • Fixed-Price Incentive Firm Contracts are designed to encourage what?
  • What does TINA stand for in the context of contracting?
  • What type of contract is typically used for commercial services?
  • If it is determined that an OCI exists, what action is recommended regarding the Request for Proposal (RFP)?
  • In the context of contracting, which aspect is least likely to influence cost realism?
  • What method is used to identify attachments in a contract?
  • Is a contract defined as a mutually binding legal relationship obligating the seller to furnish supplies and the buyer to pay for them?
  • What is one primary objective of FAR part 13's Simplified Acquisition Procedures?
  • What might inform a potential offeror about how their proposal will be evaluated for selection?
  • When should the contracting officer amend the solicitation if the Government changes its requirements?
  • If a contracting officer denies a contractor's claim in a Contracting Officer's Final Decision, what is the contractor required to do?
  • What are the two main types of termination of a contract?
  • Under negotiated procedures, solicitations are called what?
  • What does acceptance signify regarding the supplies or services?
  • What is the purpose of the Profit Adjustment Formula in a Fixed-Price Incentive Firm Contract?
  • Which of the following is NOT an expected role of a Contracting Officer?
  • The process of avoiding potential conflicts of interest is best performed when?
  • What action should contracting officers avoid to prevent the contractor from believing they have authority to bind the government?
  • Under simplified acquisition procedures, contracting officers are required to promote what to maximize beneficial offers for the Government?
  • What primary disadvantage does impaired objectivity create for a contractor?
  • When are cost elements evaluated during the contracting process?
  • What does the term "commercial product" encompass?
  • What are the four parts of a Uniform Contract Format?
  • What is used to limit competition in order to maintain an alternative source?
  • When can offerors excluded from competition request a debriefing?
  • Who is restricted from being awarded a government contract due to conflict of interest regulations?
  • What are the three phases of The Service Acquisition Process?
  • What are the two types of contract modifications?
  • What term describes the exchanges between the Government and offerors after receiving proposals to create a competitive range?
  • When contracting on a fixed-price basis, what typically fulfills the requirement for price analysis?
  • What do Positions 1-6 in a PIID identify?
  • An interested party in protests can be what type of offeror?
  • What are the two primary activities in the Pre-Award phase?
  • In which type of contract does a contractor assume the greatest cost risk?
  • What is the purpose of the Preaward Notices issued by Contracting Officers?
  • What action can interested parties potentially take regarding the cancellation of solicitations or contracts?
  • Which of the following factors does the Weighted Guidelines Method NOT focus on?
  • What are the two types of authority in contracting?
  • Which document format is specifically associated with federal contracting procedures?
  • During the proposal evaluation process, which element assesses past experiences of the offeror?
  • Which factor does NOT influence the extent of market research conducted?
  • What type of contracts would utilize the UCF format?
  • What is the primary purpose of Requests for Proposals (RFPs)?
  • How many types of formal exchanges are there between the Government and industry?
  • What does full and open competition NOT guarantee for contractors?
  • What term describes any type of procedure or combination of procedures voluntarily used to resolve issues in controversy?
  • What type of document is used in negotiated acquisitions to communicate government requirements?
  • Which type of contract allows a contractor to assume the least cost risk?
  • Letter designation D is used for which type of contract instrument?
  • In the context of contracting, who typically assumes responsibility for contract execution?
  • What does FAR Part 10 focus on?
  • What contract type should be avoided in favor of better-managed alternatives?
  • Which Source Selection process emphasizes obtaining the best overall value for the government?
  • What does Position 9 of a PIID indicate?
  • What are the three protest venues available to offerors?
  • When is price analysis utilized?
  • Which FAR Part is associated with simplified acquisition?
  • Which entity is specifically designed to assist firms in viewing current Government business opportunities?
  • The primary goal of conducting ongoing market research is to?
  • What are the two primary categories of contract types?
  • Which letter designation refers to contracts of all types except indefinite-delivery contracts?
  • Which type of authority is generally harder to prove?
  • Which type of authority is defined through explicit language?
  • Which action best reflects the Contracting Officer's obligation after an agency protest is received?
  • What must contracting officers prioritize when purchasing supplies and services?
  • Which method is NOT an effective way of engaging with the industry?
  • What should a contractor do immediately after receiving a denial from a Contracting Officer's Final Decision?
  • Amendments issued before the established time and date for receipt of proposals must be sent to whom?
  • Who receives amendments issued after the established time of proposal receipt?
  • When is it appropriate to issue a show cause notice?
  • What is Section L of a UCF primarily concerned with?
  • What role does a contract clause play in a government contract?
  • Who is responsible for developing a solicitation?
  • What element makes a contract unenforceable if any term is against public policy?
  • What does contract cost risk refer to?
  • When certified cost or pricing data are not required, why might data other than certified cost or pricing data be obtained?
  • Which of the following is a competitive procedure for fulfilling the requirement for full and open competition?
  • What is a common method for documenting negotiations in contracting?
  • What does Section A of a UCF primarily contain?
  • Can the contracting officer limit the number of proposals in the competitive range to facilitate efficient competition?
  • What defines a personal conflict of interest in the context of defense contracting?
  • True or False: A cost reimbursement contract places maximum risk and responsibility on the contractor.
  • What type of contract does the letter designation B represent?
  • At what specific points during the acquisition process is Tactical Market Research conducted?
  • Which section addresses deliveries or performance in a UCF?
  • What are the primary elements of a Fixed-Price Incentive Firm Contract?
  • What is the minimum value for business opportunities that can be viewed at the Government-wide Point of Entry?
  • What is the purpose of clarifications in the context of proposals?
  • When is it acceptable to use a Time-and-Materials contract?
  • What situation does OCI primarily address concerning contractor relationships?
  • Which authorizes the contracting officer to act outside of full and open competition?
  • What is included in Section C of a UCF?
  • What process is used to determine a reasonable price for supplies or services?
  • Which of the following is a key component of a cost analysis?
  • Which of the following is true regarding the concept of allocable costs?
  • Who has the authority to enter into a legally binding contract in DoD contracting?
  • What is the Government's policy regarding the description of agency needs?
  • How are exhibits identified in a contract?
  • Contractor claims shall be submitted, in writing, to the contracting officer for a decision within how many years after accrual of a claim?
  • The contracting officer's determination of a fair price can be guided by what prior document?
  • Which section includes special contract requirements?
  • Which of the following is NOT a participant of the Acquisition Team?
  • What is the intent behind developing a solicitation?
  • What is a contract modification that is only signed by the contracting officer called?
  • What does Section I of a UCF address?
  • According to FAR 15.401, what is defined as the price plus any applicable fee or profit for a contract?
  • Who acts as the primary business advisor during the source selection process?
  • Termination for Cause applies primarily to which type of contracts?
  • When must the Contracting Officer consider remedies in warranty conditions?
  • What does the term 'National Security' refer to in the context of contracting without full competition?
  • What information is found in Section G of a UCF?
  • Before amending an invitation for bids, what must the contracting officer consider?
  • What does it mean if a contractor is not in default due to causes beyond their control?
  • Which category of OCI is exemplified by a contractor obtaining non-public information that provides a competitive edge?
  • What is one key factor to ensure during contract closure?
  • What does a Procurement Instrument Identifier (PIID) represent?
  • What type of inspection occurs at the destination upon receiving supplies?
  • What does price analysis entail?
  • Unilateral modifications are primarily used for what purpose?
  • Which term refers to costs associated with the entire lifecycle of a contract?
  • When does title to supplies pass to the Government?
  • Under what condition is a cure notice typically issued?
  • True or False: Termination for Cause and Termination for Default are essentially the same.
  • Letter designation A corresponds to which type of contract instrument?
  • Before any contract is awarded, what must be executed as required by FAR Part 16?
  • Which section of a UCF addresses supplies and costs?
  • What is one of the main focuses of conducting market research before issuing a request for proposals?
  • What term refers to the evaluation of a proposal and an offeror's ability to successfully perform the contract?
  • To whom should protests directed at the agency be addressed?
  • What is indicated by a contracting professional's conclusion of a reasonable price?
  • Is capacity described correctly if it states that each party makes a promise or begins to render performance?
  • What are the two types of Market Research?
  • What do Positions 7-8 in a PIID represent?
  • Which type of contract is primarily used in sealed bidding?
  • The Weighted Guidelines Method assesses profit based on which of the following factors?
  • How does urgency affect the market research process?
  • What is one goal of the FAR Part 13 procedures concerning small businesses?
  • Before requesting data from contractors, where should a Contracting Officer first look for data to determine a fair price?
  • What does market research involve?
  • Which section outlines packaging and marking requirements?
  • What are the four essential elements of a contract?
  • What type of analysis is critical for identifying unbalanced pricing in contracts?
  • A show cause notice is used when there are less than how many days remaining in the schedule?
  • What term describes a situation in which an employee's financial interest or personal activities could impair their impartiality in government contracting?
  • What does IDIQ stand for in contracting terminology?
  • Which of the following are exceptions to obtaining certified cost or pricing data?
  • What is the purpose of Two Step Sealed Bidding?
  • How many levels of competition are outlined in Government contracting practices?
  • When a contractor submits a Certificate of Current Cost or Pricing Data, what are they certifying about the data?
  • What does the term "cure notice" refer to in contract management?
  • Which section would you refer to for specifications and work statements?
  • To determine whether the price of a commercial item is fair and reasonable, what must a contracting officer use?
  • What is a key feature of FAR Part 15 regarding accepted offers?
  • What contract method should agencies use for all purchases of supplies or services not exceeding the Simplified Acquisition Threshold?
  • The Government is typically required to provide all necessary property for performing Government contracts. True or False?
  • What are one-on-one meetings with potential offerors designed to facilitate?
  • What risk does unbalanced pricing present to the Government?
  • What is the main goal of conducting a Technical Evaluation?
  • Under what conditions can contractor bid or proposal information be disclosed?
  • A cost is allowable only when it meets which of the following criteria?
  • In the context of contracting, what does COTR stand for?
  • What does ADR typically encourage between the parties involved?
  • What is typically required from contractors according to solicitation clauses?
  • What is a term or condition used only in solicitations and applying only before contract award?
  • What type of notice must the Contracting Officer provide to offerors whose proposals were not selected for award?
  • When does the clock for the 6-year period to submit a claim begin?
  • For which procurement actions must agencies include all PIIDs?
  • What term refers to a condition used in both solicitations and contracts that applies after contract award or both before and after award?
  • Is it true that price to the Government must be evaluated in every source selection?
  • Bilateral modifications can also be used to definitize what type of contracts?
  • What type of authority is created through verbal or written communication?
  • What is the structured approach to profit analysis used by the DoD called?
  • What is meant by cost or pricing data in price agreements?
  • Who is responsible for analyzing planned acquisitions to identify potential organizational conflicts of interest?
  • What describes the agreement between parties involved in a contract?
  • What are the three main evaluations included in a Proposal Evaluation?
  • For proposed contract actions expected to exceed what amount must the contracting officer synopsize in the Governmentwide point of entry (GPE)?
  • In a contract, what does the term 'offer' refer to?
  • What type of evaluation focuses on the monetary aspects of proposals?
  • Which type of Market Research is conducted continuously throughout the acquisition process?
  • Where can the text of required contract clauses and solicitation provisions be found?
  • True or False: Agencies must use Simplified Acquisition Procedures for all purchases of supplies or services not exceeding the Simplified Acquisition Threshold.
  • When must agencies conduct Market Research?
  • What process is used to determine if industry can support the acquisition needs of the Government?
  • Under what circumstances can a unilateral modification be used?
  • What type of contract should be used for acquiring commercial items?
  • What typically establishes pricing reasonableness in government contracting?
  • What is the review and evaluation of separate cost elements and profit or fee in a contractor's proposal called?
  • When the Government changes its requirements or terms and conditions, the contracting officer must what?
  • What are the two types of Market Research?
  • According to the Anti-Deficiency Act, no Government officer or employee may obligate funds in excess of available appropriations without what?
  • What is a common action taken by DoD contracting officers during the solicitation process?
  • Which contract type places maximum risk on the contractor?
  • What is the objective of proposal analysis?
  • What term applies in both contracts and solicitations before and after award?
  • A price is considered based on adequate price competition when which of the following criteria are met?
  • What is the main goal of discussions in competitive contracting?
  • What is the term for the individual or group conducting the source selection evaluation?
  • In the Uniform Contract Format (UCF), where can information on inspection be found?
  • What are the two forms of Cost Plus Fixed Fee contracts?
  • Which of the following is not one of the four essential elements of a contract?
  • What happens if the Contractor fails to perform due to causes beyond their control?
  • What is the term for the government's right to partially or completely terminate a contract without paying damages?
  • When should acquisition planning begin according to Government policy?
  • What are limited exchanges between the Government and offerors when award without discussions is anticipated?
  • What is the primary purpose of the Award phase in the contract life cycle?
  • Which modification type requires signatures from both the contractor and the contracting officer?
  • What is defined as a written objection raised by an interested party?
  • What is the process called that evaluates proposed cost elements for realism, understanding, and consistency?
  • What type of orders does letter designation F refer to?
  • True or False: Cost-reimbursement contracts require the contractor to exert their best effort to perform and ensure payment for allowable costs.
  • When must amendments be sent to everyone who received invitations and displayed in the bid room?
  • Amendments issued after the deadline for receipt of proposals must be provided to whom?
  • What indicates a significant discrepancy in contract line item pricing?
  • Who is responsible for preparing an offer?
  • What is an example of Tactical Market Research?
  • What does the term "buying-in" refer to in government contracting?
  • Which of the following options is a component of the acquisition planning process?
  • Which of the following is NOT typically found in solicitation provisions?
  • Which contract method is appropriate when adequate specifications are not available and sealed bidding is desired?
  • Under TINA, contractors are required to provide actual costs in what format to assist the CO?
  • When should a cure notice be issued?
  • How many days does the Contracting Officer have to provide postaward notices after the contract award date?
  • What is the purpose of a Contracting Officer's Final Decision?
  • What are the three phases of the contract life cycle?
  • Which of the following should be clearly identified and excluded from government contract billing?
  • Amendments issued before the established time for receipt of proposals are sent to whom?
  • Which type of analysis is performed to ensure a final price is fair and reasonable?
  • When drafting solicitations and contracts, what must contracting officers identify for each line item number?
  • Which role is primarily responsible for ensuring that a contract aligns with business objectives?
  • True or False: Communications during the evaluation stage are only for clarifying technical aspects.
  • What is typically the first step after an agency protest is received by a Contracting Officer?
  • Is a cost-plus-a-percentage-of-cost system of contracting permitted?
  • If an agency protest is received before the award, what is the typical action of the Contracting Officer?
  • Can the apparent or actual authority in contracting be delegated unless specifically stated?
  • Which of the following contract types offers a fixed amount regardless of the incurred costs?
  • What is the Total Cost of a contract defined as?
  • Which of the following is NOT a reason for agencies to exclude a source from a contract action?
  • What qualifies as an excusable delay for contractors?
  • What is the primary purpose of the Prompt Payment clauses?
  • Who is responsible for the acceptance of supplies or services?
  • Under which conditions does FAR part 12 not apply to the acquisition of commercial items?
  • Which contract type gives the contractor minimal responsibility for performance costs?
  • Business conducted by the government should be characterized by which of the following principles?
  • True or False: The lowest price technically acceptable (LPTA) process prioritizes cost above other factors.
  • What is a key outcome of effective proposal analysis?
  • What type of competition is defined as providing full access with no exclusions?
  • Which PIID is used to identify amendments to solicitations and modifications?
  • Which of the following describes a contractor having special insight into the government’s needs that may lead to a competitive advantage?
  • What is the primary purpose of a post-award orientation?
  • What must be calculated meticulously in government contracts to avoid discrepancies?
  • Which contract method is utilized when a government agency chooses to negotiate rather than use sealed bidding?
  • When should the contracting officer establish pre-negotiation objectives?
  • Which of the following is NOT a method of industry engagement?
  • What does 'Certificate of Current Cost or Pricing Data' certify?
  • When is it considered necessary for a contractor to avoid OCI instead of mitigating it?
  • What is a potential risk of "buying-in" for contractors?
  • Does a Cost-Plus Incentive Fee contract include a fee adjustment formula?
  • Which one of the following describes the reciprocity required in a contract?
  • Which party cannot issue a protest?
  • Which of the following is NOT an element of a Cost-Plus Incentive Fee contract?
  • A bilateral modification is also known as what type of agreement?
  • What kind of authority exists based on reasonable belief of a third party?
  • Which of the following is NOT one of the three broad categories of OCI?
  • What is prohibited regarding gifts received by federal employees?
  • How many alpha and/or numeric characters are in a PIID?
  • Is it true that a Pre-Negotiation Memorandum (PNM) should only include the purpose of negotiation?
  • Who is primarily responsible for determining the fairness of offered prices?
  • Which of the following is NOT a factor the Contracting Officer considers when preparing warranty terms?
  • Which member of the acquisition team has the authority to contractually obligate the Government?
  • What term describes the exchanges in a competitive environment aimed at allowing the offeror to revise its proposal?
  • What type of information would be included in Section D of a UCF?
  • What does Section M of a UCF outline?
  • What does "acquisition" refer to in contract terms?
  • Which of the following is typically NOT a part of the post-award phase?
  • Under which circumstances must contracting officers solicit sealed bids?
  • What does Section E of a UCF pertain to?
  • What aspect of a contract ensures it aligns with societal norms and legal regulations?
  • Which activity is specific to the Award phase?
  • Upon what condition does the risk of loss pass to the Government?
  • Which authority might lead others to believe that a representative has the power to act on behalf of the government?
  • Which competition type allows for the exclusion of certain sources after initial reviews?
  • What does the PIID position 10-17 identify?
  • What type of memorandum would typically document negotiation outcomes?
  • What does TINA empower the CO to obtain when market forces are not present?
  • Which team member has the authority to award, change, or terminate a contract?
  • Which of the following describes FAR Part 13?
  • What describes the risk a contractor undertakes based on the type of contract and cost estimation?
  • Which part of the Uniform Contract Format contains representations and instructions?
  • What are discussions with offerors considered in the proposal evaluation process?
  • Is cost realism analysis applicable to fixed-price incentive contracts?
  • Which of the following actions is NOT permissible for government personnel regarding contract modifications?
  • What is evaluated during a cost-reimbursement contract to determine cost realism?
  • What are the two types of warranties for commercial products and services?
  • What is a request to submit offers or quotations to the government?
  • A modification to the solicitation is referred to as what?
  • Protests can generally be submitted to which of the following?
  • When should market research be conducted?
  • Which of the following is NOT a cost included in the Contracting Life-Cycle?
  • What is the main purpose of cost analysis?
  • A contract awarded using procedures other than sealed bidding is known as what?
  • What does letter designation B represent in a contract instrument?
  • Which of the following best describes the purpose of effective cost and pricing data?
  • What is a set-aside in the context of government contracting?
  • In a Cost Plus Fixed Fee contract, what types of fees may be specified?
  • What does OCI stand for in the context of government contracting?
  • For proposed contract actions that exceed which amount but do not exceed what other amount must the contracting officer post in a public place?
  • Which technique is NOT commonly used to promote early exchanges of information?
  • In the context of government contracting, what is considered unallowable?
  • What do agencies need to avoid according to the Government's contracting policy?
  • After the establishment of the competitive range, discussions can take place. True or False?
  • Which among the following is an example of a procurement action?
  • Which FAR Part covers commercial contracts?
  • Under what circumstances do contractor obligations extend during delays?
  • After which event must the contracting officer become the focal point for any exchanges with potential offerors?
  • Which OCI category most commonly occurs when a contractor drafts the Statement of Work or provides technical directions?
  • Which of the following is a key benefit of using Alternative Disputes Resolution?
  • Which type of contract instrument is indicated by letter designation C?
  • A federal employee may accept gifts from which of the following sources?
  • What are the two primary activities in the Post-Award phase?
  • When is Market Research continuously conducted by agencies?
  • What is the term used when the overall price appears reasonable but cost or price analysis indicates certain line items are significantly over or understated?